Pedestrian Bridge
The footbridge connects two raised plateaus of a new park on the site of the former KRUPP steelworks. The 100 metre-long bridge forms the final part of a circular path within the West inner-city park, and in conjunction with the Canyon it forms the gateway to the Century Hall.
The V-shaped supports, which transfer their loads to large blocks, not only highlight the gateway aspect, but also convey the idea of crossing the valley on stilts.
The night-time illumination was developed as an interactive project together with lighting artist Achim Wollscheid. Movement sensors detect people crossing the bridge and a computer program converts this information into control impulses for the lighting, causing the light to follow people playfully as they walk across.
Building Typology: | Transport, Infrastructure |
---|---|
Location: | Bochum |
Country: | Germany |
Planning / Construction Period: | 05/1999 - 10/1999 |
Order type: | New Building |
Client: | LEG Landesentwicklungsgesellschaft NRW GmbH, Dortmund |
Project Participants: |
|
Scope of Services: | Architecture |
Awards: |
Renault Traffic Design Award 2003 BDA Award for Good Buildings 2003 |